BIBKO Ready Mix Recycling System

Estimated Average Annual Return and Pay Back Years

  Case 1 Case 2 Insert your Numbers
1. Estimated Amount of Ready Mix Produced Per Year (Cu.Yds)

80,000

100,000

2. Multiply by 2 to equal tons of ready mix sold per year.

160,000

200,000

3. Multiply by 80% (.8) to equal tons of aggregate used per year. Balance of weight is water & cement. bmx bike games

128,000

160,000

4. Estimated return rate in mixer trucks annually as a % of total ready mix produced. Новокосино заказ пиццы на сайте пиццерии. Вы можете сами придумать пиццу.

3%

3%

5. Estimated cost of delivered aggregate per ton.

$10.00

$10.00

6. Multiply Lines 3 & 4 to get savings potential in tons of aggregate. 3,840 tons 4,800 tons

7. Estimated annual savings of aggregate costs. (Line 6 * Line 5)

$38,400

$48,000

8. Bibko Cost – Estimated site prep and installation.

$125,000

$135,000

9. Time until investment is paid back. (Line 8 / Line 7) 3.25 Years 2.8 Years

10. Recovery savings per yard of ready mix sold. (Line 7 / Line 1)

$0.48

$0.48

*Note* Further savings associated with improved efficiencies of mixer truck utilization as well as environmental compliance, depending on local municipal regulations. pantallas de ordenador baratas
You can print this page from your browser or download a worksheet file written in Microsoft Excel 97 & 5.0/95 Workbook format. To download, click on bibkoworksheet.xls with the right mouse button and choose the "Save Link As" menu item. Мониторинг транспорта gprs системы мониторинга вашего транспорта

Home | About Us | Services | Contact Us

Design by: ConcretePumping.com
All contents © copyright 2002 Cole & Lambert, Inc. All rights reserved.